Modular cleanrooms
ENGINEERING · PROCUREMENT · CONSTRUCTION

EPC for cleanrooms

Cleanroom design, equipment and material procurement, construction, installation and commissioning under a single EPC contract.

Prefabricated cleanroom with ventilation ductwork above the ceiling
Cleanroom enclosure and ventilation system

What is cleanroom EPC?

EPC stands for Engineering, Procurement and Construction. Under this contracting model, one contractor manages all three phases within the agreed scope. For a cleanroom, this brings the layout, enclosure, ventilation, filtration and controls together from the project brief through acceptance.

Three-dimensional layout of modular cleanrooms
Three-dimensional layout of modular cleanrooms

The three stages of EPC

Engineering and design

The design translates the project brief into a cleanliness class, room layout, zoning, and personnel and material flows. It covers cleanroom HVAC and filtration, electrical services and controls, with targets for temperature, humidity and pressure differentials between zones.

Stage outcome

Coordinated drawings, environmental requirements, service interfaces and specifications for procurement.

Procurement and supply

Approved specifications guide sourcing of air handling units, filters, cleanroom panels, ceiling components, doors, windows, power distribution equipment and supporting materials. Procurement includes checking component specifications, documentation, completeness and delivery timing.

Stage outcome

Specified materials and equipment, supply documentation and a delivery plan for the site.

Construction, installation and commissioning

Site work includes building and installation, fitting the cleanroom enclosure and ceilings, installing services and connecting equipment. The systems are then commissioned and tested as required by the contract, including checks such as airflow, pressure differentials and other agreed performance parameters.

Stage outcome

Installed and commissioned systems, test records and handover documents for acceptance within the contracted scope.

CONTRACT SCOPE

What is the EPC contractor responsible for?

The EPC contractor is responsible for quality, worksite safety, schedule and agreed cost within its contracted scope. For each project, the contract defines WONCLEAN’s role, its scope of supply and work, and who handles installation, commissioning and acceptance.

Responsibilities across the EPC stages
Project briefThe owner and process team establish room functions, environmental targets and site constraints.
Design and procurementThe contractor coordinates design and specifications within its scope. The project documentation identifies what is supplied and the requirements for equipment.
Construction and safetyThe contract identifies site work, responsible parties, safety requirements, site preparation and permits.
Quality and acceptanceThe parties agree quality and acceptance criteria, test methods, measurement conditions and handover documents in advance.
Schedule and costThe contract sets the schedule and cost for the agreed work and supplies, along with the process for approving changes.

What to prepare for an EPC discussion

Share what has been approved and flag any requirements that are still open.

  • A dimensioned building plan with room heights and installation openings
  • Room functions, process equipment and equipment dimensions
  • Personnel and material flows, access points and transfer interfaces
  • Cleanliness class, temperature, humidity and pressure differentials
  • Available building services and connection points
  • Site location, target dates and expected scope of work

Discuss the scope of your project

Share your layout and project brief so we can review the work, supplies and tests to include.

Discuss your project scope

Tell us what you’re planning

Share your contact details and project requirements so our team can get in touch.